The elastic strain for steel is about_________________?

A. 1/12 of strain at the initiation of strain hardening and about 1/120 of maxi-mum strain
B. 1/2 of strain at the initiation of strain hardening and about 1/12 of maxi-mum strain
C. 1/12 of strain at the initiation of strain hardening and 1/200 of maximum strain
D. 1/24 of strain at the initiation of strain hardening and about 1/200 of maximum strain

Pick up the correct statement from the following_________________?

A. When the electric field oscillates in the direction of the electric vector, a plane polarised wave is formed
B. When the electric vector is in the plane of incidence, vertical polarisation is formed
C. When the electric vector is at right angles to the plane of incidence, horizontal polarization wave is formed
D. All of these

Pick up the correct statement from the following?

A. The minimum frequency of light for which no electrons are emitted, is called threshold frequency
B. Polarising angle of glass is 57.5°
C. At the polarising angle, the reflected and refracted rays are orthogonal
D. All the above

Pick up the correct statement from the following ?

A. The refractive index of a medium varies according to the wavelength of the radiation,
B. The variation of the refractive index with wave length, is called dispersion,
C. The splitting of colours of white light by passing through a prism is caused due to dispersion
D. All of these

Geodimeter is based on_________________?

A. Propagation of modulated light waves
B. Propagation of infrared radiation
C. The visible light as carrier with frequency of the order of 5 × 1014 Hz
D. High frequency radio waves

Select the incorrect statement ?

A. The progress of work in low level method of mound construction is very slow.
B. Barge method of mound construction is economical.
C. In low level method of mound construction, the area of working is limited.
D. In staging method of mound cons-truction, the work is not interrupted even during stormy weather

Which of the following are repair docks ?

A. marine railways, dry docks, floating docks, wet docks
B. dry docks, wet docks, floating docks, lift docks
C. wet docks, floating docks, lift docks, marine railways
D. wet docks, lift docks, marine railways, dry docks